2-10 Southwark Bridge Road, London. SE1
Description: Commercial Building, Office Block, Refurbish Entire Building, Add 3 Floors
In September 2020, Blu 3 UK Ltd (Netherland Branch) appointed STAP on a project in Holland where they were using a combination of a pan shuttering system on the internal face of walls and timber shuttering on the outside face of the walls. The project is A large-scale data centre project on behalf of a bluechip software company.
STAP were also responsible for performing Design Checks on the following;
- Ground Bearing Capacity for Mobile Crane Outrigger Load
- Tower Crane Tie Frame
- Temporary Scaffold Leg Load
- Access, Gantry & Hoist Scaffold
- Plant Justification - Floor Load Capacity
In 2020, STAP were then instructed design the following:
- Cantilevered Access Platform for Brickwall Demolition
- Riser Demolition Crash Deck Design
- Design Checks for Hoarding & Tunnel Scaffold Timber Covering
- Cantideck Design Check
- Plant Transfer Deck Design Check
- Crash Deck For South East Corner Demolition
- Temporary Support to Wall Main Stair Core
- Scaffold Support Tower Support Location
- Ground Bearing Capacity Design Check
- Crash Deck for Removal of South & North Staircase
- 11th Floor Metal Deck Slab Capacity Design check for Spider Crane
- Slab Load Capacity Design Check - UPS System
- Slab Load Capacity Design Check - 8 Yard Skip
CONTINUED WORKS FOR ROSE COURT
Finally, throughout 2021, STAP carried out:
- Metal Deck Slab Load Capacity Design Check for Sprinkler Tank
- Lvl 7 Wedge Slab Load Capacity Check - Mast Climber
- Spreader Beam Design for Mast Climber on Lvl 7 Wedge Slab
- Level 11 Floor Slab Capacity Design Check for Spider Crane
- Level 11 Slab Load Capacity Design for Brick & Block Pallets
- Ground Bearing Capacity for Scaffold Leg Load Design Check
- Ground Bearing Capacity for Mobile Crane Outrigger Load
- Level 11 Floor Load Capacity Design Check for URW-245 Crane
- Basement Plenum Cover Slab, Support & Design Check